Commercial Case Study - Apartment Blocks - Croydon

  • Client: Apartment Blocks - Croydon - Accrington
  • Completed on: April 2017
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study
Accrington Case Study

Project Info:

600 meters of profiled steel roof sheets cut edge protection with 12 year guarantee.

300 meters of Plygene Gutterliner with 25 year guarantee.

Blue Sky Guttering were asked by the collage to find a solution to the leaking steel gutters at the collage, during the survey it soon became apparent that the steel gutters were corroding and the best solution would be to install a Plygene Gutterline System by HD Sharman whom we are approved contractors for and can offer a 25 year guarantee on the gutter lining. Blue Sky Guttering install 1,000’s of meters of Plygene Gutterline and work closely with HD Sharman when specifying and installing the Gutter lining, (they even provided a techinican when Blue Sky Guttering installed a gutter liner at Buckingham Palace)

Another corrosion problems that occurs is the cut edges of steel profiled roof sheets, the bare metal is exposed and is prone to corroding (images attached) and it was no surprise that when we were checking the gutters at the collage the roof coatings were peeling at the cut edges and the metal was corroding. Left untreated theses but edges would continue to corrode eventually would pit and hole and new roofing sheets would be needed. We advised the collage and it was agreed to apply a cut edge coating. Blue Sky Guttering are approved contractors for Liquasil Ltd and can offer a 12 year guarantee with all our cut edge coatings and a 20 year guarantee with our roof coatings.